Time a system requires to reach the steady operating state from the switched off state.
Fluidlexikon
Time a system requires to reach the steady operating state from the switched off state.
HAWE Oil-Hydraulic Technology (Shanghai) Co., Ltd.
155 Jindian Road
201206 PuDong / Shanghai
P.R. China
China
电话: +86 21 58999678
传真: +86 21 50550836
info (at) hawe.com.cn