Time from the "on" switching command to the "off" switching command.
Of a solenoid:
ratio of the switch-on time to the duration of a working cycle in %.
The ratio of load to relief time is termed the actuated time in %. The actuated time is based on a maximum duration of operation of 10 min. The ratio of switch-on time to duration of operation is called the relative switch-on time.